2022 Topcon Construction Paving, Milling and Compaction 3D-MC Asphalt

2022 Topcon Construction Paving, Milling and Compaction 3D-MC Asphalt

Swipe to View More

  • Year 2022
  • Make Topcon Construction
  • Model Paving, Milling and Compaction
2022 Topcon Construction Paving, Milling and Compaction 3D-MC Asphalt

2022 Topcon Construction Paving, Milling and Compaction 3D-MC Asphalt

2022 Topcon Construction Paving, Milling and Compaction 3D-MC Asphalt

Smooth roads, smooth traffic

Pave to your plan every time

Features may include:

According to plan

  • Control any paver right from digital site plans. The 3D-MC Asphalt Paver automatically produces exact thickness at exact slopes, with fast and accurate 3D transitions through horizontal and vertical curves. Everything goes according to plan; in this case, a 3D plan with a 3D design.
  • Millimeter-level accuracy
  • 2,400-meter horizontal working range
  • 40-meter vertical working range
  • Multiple users in the same zone
  • Horizontal, vertical, or combined paving transitions

Exact thickness and slope

  • At the heart of Topcon 3D paving is Millimeter GPS technology — a system that achieves highly accurate positions and elevations. The control box senses the paving location within the 3D design and grade required, sending correction signals to the screed to maintain mat thickness and slope. A full system assembly features up to four transmitters for a large horizontal and vertical working window. This creates a working zone that allows you to pave at the millimeter-level.

Product Photography